Quick answer: in 2026, a cosmetic renovation in Queensland typically runs $900-$1,800 per square metre, a mid-range renovation $1,800-$3,200 per square metre, and a high-end or structural renovation $3,200-$5,500 per square metre. A full renovation of a 180 sqm home therefore commonly lands between $160,000 and $450,000 depending on scope and specification.
What the square-metre rates actually mean
Rate per square metre is a planning tool, not a quote. It is useful for testing whether a project is roughly viable before you spend money on drawings. The rate covers the finished floor area being renovated, including labour, materials, waste, site costs and margin, but excluding professional fees and furniture.
- Cosmetic - $900 to $1,800/sqm: paint, flooring, joinery refresh, lighting, doors, skirting and architraves, no structural change
- Mid-range - $1,800 to $3,200/sqm: new kitchen and bathrooms, some wall removal, reworked services, new outdoor living
- High-end / structural - $3,200 to $5,500/sqm: reconfiguration, steel, new openings, premium finishes, custom joinery
- Second-storey additions and complex extensions - $3,800 to $6,500/sqm of new floor area
Room-by-room budgets for 2026
- Kitchen - $22,000 budget refit, $35,000-$60,000 mid-range, $70,000+ premium with custom joinery and stone
- Main bathroom - $22,000-$32,000 typical full strip-out and rebuild; $40,000+ for larger or high-spec
- Ensuite - $16,000-$26,000
- Laundry - $8,000-$18,000 depending on joinery and whether plumbing moves
- Internal wall removal with steel beam - $6,000-$18,000 including engineering and make-good
- Flooring throughout 120 sqm - $9,000-$22,000 depending on material
- Timber deck, 30 sqm - $18,000-$32,000; composite $24,000-$42,000
- Garage conversion to habitable room - $30,000-$70,000
- Ground-floor extension - $320,000+ for a substantial addition; small bump-outs considerably less
These are Gold Coast and Brisbane figures for 2026 and assume licensed trades, compliant waterproofing and proper certification. Anything meaningfully below these ranges usually has an exclusion list doing the heavy lifting.
The seven things that actually move the price
- Whether you move plumbing and drainage - relocating a wet area is the single biggest cost multiplier in any renovation
- Whether walls are load-bearing - a beam brings engineering, propping, and ceiling and cornice make-good
- Access - narrow lots, high-set homes, canal frontage and upper-level apartments all add labour hours
- Age of the home - pre-1990 means asbestos testing and potentially licensed removal
- Specification - the same kitchen layout can vary by $40,000 on finishes alone
- Approvals - certification, engineering and any development application
- Decision timing - late changes cost far more than early ones, because they unwind completed work
Planning work on the Gold Coast or in Brisbane? Talk to a QBCC-licensed team (Licence No. 15620733) and get a fixed-price quote after a proper site inspection.
Get an initial estimateWhere the money goes on a typical $250,000 renovation
- Structure, framing and carpentry - roughly 22%
- Kitchen and joinery - roughly 16%
- Bathrooms, waterproofing and tiling - roughly 15%
- Services (electrical, plumbing, mechanical) - roughly 13%
- Finishes (plaster, paint, flooring) - roughly 12%
- Windows, doors and external works - roughly 9%
- Preliminaries, waste, access and site costs - roughly 7%
- Professional fees and certification - roughly 6%
How to reduce cost without wrecking the result
Cost control in renovation is almost entirely about decisions made before demolition. Keep wet areas where they are. Keep the roof line where it is. Lock in every selection before the contract is signed rather than choosing tiles in week three. Spend on the things you touch daily - benchtops, tapware, door hardware, flooring - and save on the things nobody notices, like the carcass material inside a cabinet or the brand of a concealed fixing.
Staging works well when it is planned as a sequence rather than used as an excuse. Doing the structural work and services in one stage and the finishes later is sensible. Doing the kitchen now and the wall removal next year usually means paying twice.
Comparing quotes properly
Three quotes with a $70,000 spread almost always means three different scopes. Line the exclusions up side by side. Ask each builder what allowance they carried for tiles, tapware, benchtops, waterproofing, electrical points and rubbish removal. Ask what is a provisional sum. The cheapest number on the page is regularly the most expensive project by the end.
Not sure what your budget stretches to? Upload a photo of the space and our AI Renovator returns a concept and an indicative cost in about a minute.